Four laning of Akkalkot ‐ Solapur section of NH ‐ 150E with paved shoulders from design chainage km. 99.400 to km. 138.352 / existing chainage from km. 102.819 to km. 141.800 (design length 38.952 km.) including Akkalkot bypass (design length 7.350 km.)
SPV | GR Akkalkot Solapur Highway Private Limited (GASHPL) |
---|---|
Authority | National Highways Authority of India (NHAI) |
Project Location | Maharashtra |
Appointed Date | 14th Dec 2018 |
Construction Period | 730 Days |
PCOD | 31st Mar 2021 |